No | Nama Peserta | K | B | A | T | P | PT | H | P | PK | Alasan |
---|---|---|---|---|---|---|---|---|---|---|---|
1 | PT. Iksan Buana Karya - 02.836.969.2-822.000 | Rp. 6.877.019.834,92 |
Rp. 6.877.019.834,92 |
||||||||
2 | GORONTALO PRIMA JAYA, PT - 71.129.576.6-822.000 | Rp. 6.999.999.929,18 |
Rp. 6.999.999.929,18 |
Tidak menghadiri Pembuktian Kualifikasi | |||||||
3 | CV. BERKAT BATAVIA - 02.228.245.3-822.000 | |
|
||||||||
4 | CV. HIDAYAT JAYA - 02.227.611.7-822.000 | |
|
||||||||
5 | PT. TRI KARYA MARADDA - 73.303.811.6-801.000 | Rp. 6.791.650.662,50 di bawah 80% Nilai HPS |
Rp. 6.791.650.662,50 di bawah 80% Nilai HPS |
Jadwal pelaksanaan pekerjaan Kurva S tidak diuraikan untuk setiap item mata pembayaran yang ada dalam daftar kuantitas dan harga | |||||||
6 | PT. MANGGABAI ENERGI CAHAYA - 02.227.781.8-822.000 | Rp. 6.807.185.306,90 |
Rp. 6.807.185.306,90 |
Tidak menguraikan tahapan waktu pelaksanaan pada metode pelaksanaan pekerjaan | |||||||
7 | PT. BUGISTA - 02.821.504.4-805.000 | Rp. 6.463.181.550,10 di bawah 80% Nilai HPS |
Rp. 6.463.181.550,10 di bawah 80% Nilai HPS |
1. Jadwal dan jangka waktu pelaksanaan pekerjaan tidak sampai dengan serah terima pertama Pekerjaan Oleh PPHP dalam bentuk Kurva S 2. Tidak konsistensi antara Jadwal pelaksanaan dengan metode pelaksanaan, dimana pada jadwal pelaksanaan pekerjaan bronjong dilaksanakan pada minggu ke 2 bulan 4 s/d bulan 5 minggu ke 4 dan pada metode pelaksanaan dilaksanakan pada minggu ke Dua bulan ke empat dan minggu ke empat bulan kedua hingga minggu ke empat bulan ke lima | |||||||
8 | PT. TAKABEYA TEKNIK KONSTRUKSI - 80.909.322.2-822.000 | Rp. 6.534.424.014,50 di bawah 80% Nilai HPS |
Rp. 6.534.424.014,50 di bawah 80% Nilai HPS |
Bukti kepemilikan peralatan utama (Dum Truck) yang disampaikan dalam dokumen penawaran setelah dilakukan klarifikasi lapangan oleh Pokja ULP bahwa penyedia tidak dapat menunjukan bukti kepemilikan dari peralatan utama (Dum Truck) yang dalam dokumen penawaran dinyatakan milik perusahaan. | |||||||
9 | PT. SINAR NUSA GOLINDO - 02.227.268.6-822.000 | Rp. 6.805.211.645,62 |
Rp. 6.805.211.645,62 |
||||||||
10 | PT. GUNUNG MAKMUR - 02.517.508.4-647.000 | |
|
||||||||
11 | PT. PURA KARYA MANDIRI - 73.909.389.6-723.000 | |
|
||||||||
12 | CV. BITAWULA - 03.263.266.3-822.000 | |
|
||||||||
13 | PT. BUMI TALAGA SEJAHTERA - 73.164.229.4-822.000 | |
|
||||||||
14 | PT. DWI PONGGO SETO - 01.454.500.8-641.000 | |
|
||||||||
15 | CV. AL KAUTSAR - 02.227.457.5-822.000 | |
|
||||||||
16 | CV. DANIN KARYA PRATAMA - 03.170.897.7-822.000 | |
|
||||||||
17 | CV. ANUGERAH TIRTA SUKSES - 02.228.138.0-822.000 | |
|
||||||||
18 | CV. SABRIANA LESTARI - 02.020.661.6-822.000 | |
|
||||||||
19 | PT. BERLIAN PANCA KARYA - 76.587.313.8-822.000 | |
|
||||||||
20 | Pt. tri sandi yudha - 01.666.587.9-822.000 | |
|
||||||||
21 | CV. SURYA QUEEN - 75.075.931.8-822.000 | |
|
||||||||
22 | CV. SURAPUTRA - 02.535.003.4-822.000 | |
|
||||||||
23 | CV. Arcadia Grida Pradana - 02.534.801.2-822.000 | |
|
||||||||
24 | PT ORO JAYANTO PERKASA - 66.558.125.2-822.000 | |
|
||||||||
25 | CV. CAHAYA FAJAR - 03.091.658.9-822.000 | |
|
||||||||
26 | CV. FAJAR MANDIRI - 03.091.659.7-822.000 | |
|
||||||||
27 | PT. CITRA PUTERA LA TERANG - 01.906.377.5-805.000 | |
|
||||||||
28 | CV. NOVI STAR - 03.091.895.7-822.000 | |
|
||||||||
29 | PT. Fathirabizar Karyatama - 03.091.547.4-822.000 | |
|
||||||||
30 | PT. Perdana Putra Bajatama Gorontalo - 80.516.502.4-822.000 | |
|
||||||||
31 | PT. DAFDAN PUTRA REZEKI - 02.836.794.4-822.000 | |
|
||||||||
32 | CV. GARUDA SAKTI - 01.114.341.9-822.000 | |
|
||||||||
33 | CV. CAHAYA MANDIRI - 02.227.950.9-822.000 | |
|
||||||||
34 | CV. ANNORA - 82.636.111.5-822.000 | |
|
||||||||
35 | CV. DIAN JAYA UTAMA - 02.228.031.7-822.000 | |
|
||||||||
36 | CV. Gorontalo Teknik Consultan - 03.241.627.3-822.000 | |
|
||||||||
37 | CV. MEKAR BUILT - 03.226.925.0-822.000 | |
|
||||||||
38 | CV. Neva Utama - 02.227.527.5-822.000 | |
|
||||||||
39 | CV. AGIS EKA TAMA - 02.534.733.7-822.000 | |
|
||||||||
40 | CV. CAHAYA TEKNIK PRIMA - 02.227.534.1-822.000 | |
|
||||||||
41 | CV. ZULFI GLOBAL PERKASA - 02.837.195.3-822.000 | |
|
||||||||
42 | CV BAYOORS - 73.786.842.2-822.000 | |
|
||||||||
43 | CV. CIVIL_ARCH ENGINEERING CONSULTANT - 80.218.995.1-822.000 | |
|
||||||||
44 | CV. RAVI PUTRA PERDANA - 02.680.234.8-822.000 | |
|
||||||||
45 | CV. MEGATECH ESTETIKA - 03.091.901.3-822.000 | |
|
||||||||
46 | CV.AUDREY KARYA - 82.465.203.6-822.000 | |
|
||||||||
47 | PT. CAHAYA TIMUR SINANDAHA - 76.410.589.6-822.000 | |
|
||||||||
48 | PT. PRIMA ABADI MAKASIO - 01.537.382.2-821.000 | |
|
||||||||
49 | CV. Irma Karya - 02.227.653.9-822.000 | |
|
||||||||
50 | CV. BERKAH AMALIA RIFAI - 83.958.156.8-822.000 | |
|
||||||||
51 | PT. SULTANA ANUGRAH - 02.702.103.9-804.000 | |
|
||||||||
52 | PT. MARTUA JAYA MEGAH - 01.304.180.1-027.000 | |
|
||||||||
53 | PT. SINAR TRANS EXPRES - 82.401.310.6-822.000 | |
|
||||||||
54 | PT.GOKMA PARULIAN PERKASA - 01.640.236.4-013.000 | |
|
||||||||
55 | CV.MULTI USAHA MANDIRI - 71.641.049.3-822.000 | |
|
||||||||
56 | PT. GRAHA PRASARANA SENTOSA - 01.799.033.8-941.000 | |
|
- A Evaluasi Administrasi
- T Evaluasi Teknis
- ST Skor Teknis
- P Penawaran
- PT Penawaran Terkoreksi
- HN Hasil Negosiasi
- SH Skor Harga
- SA Skor Akhir
- B Pembuktian Kualifikasi
- K Evaluasi Kualifikasi
- SK Skor Kualifikasi
- SB Skor Pembuktian
- H Evaluasi Harga/Biaya
- P Pemenang
- PK Pemenang Berkontrak